Skip to content

Flycam Flowline Master for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm

Original price US $1,393.00 - Original price US $1,393.00
Original price
US $1,393.00
US $1,393.00 - US $1,393.00
Current price US $1,393.00
SKU : FLCM-FLN-MSTR-PLA-01

 
 

MAKES YOUR BACK COMFORTABLE &
YOUR SHOTS MORE STABLE!

01.

OFFERS COMFORTABLE SHOOTING EXPERIENCE
Flycam understands the pain of Film-makers & brings you the most iconic combination of Flycam Flowline Master with Placid Arm.
The extended handheld camerawork can prove to be a backbreaker that would result in fatigue & distorted shots.
The Flowline takes the weight off your shoulders & arms and redistributes it across the entire back, and the Placid Arm absorbs the distortion & delivers silky smooth shots.

Flycam Flowline Master for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm
Flycam Flowline Master for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm

02.

THE BEST STABILIZATION SYSTEM
The Flycam Flowline Master Vest ensures more support around the Shoulders and Back while accessing Cameras, Camcorders & Gimbals and lets you shoot comfortably for a longer duration.
At the same time, Flycam Placid is a 2-axis Spring Arm that attaches to the end of your Flycam Flowline, stabilizes and smoothens the shots while moving or running.
The Flycam Placid pivots around its axis and provides side to side stabilization along with Vertical Stabilization.

03.

CALIBRATE PRECISELY TO YOUR NEEDS
The Flycam Flowline adjusts to balance the load placed on the Support Rope by turning the knob present on the rig's back.
And the Placid Arm elements like the Interchangeable Spring Mechanism and the Easy Adjustment Knob lets you easily adjust its tension to balance the setup.

Flycam Flowline Master for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm
Flycam Flowline Master for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm

04.

MOST VERSATILE CAMERA SUPPORT RIG
This mechanical combination is a perfect solution for filmmakers. It lets you work in challenging locations for longer hours where you cannot use electronic equipment.
It allows you to be flexible & more creative in your shots; you can quickly take high & low shots with the help of this combination.

05.

THE INVESTMENT THAT LASTS
We know the Film-maker's life takes a toll on your gear. Yet this combination of Flycam Flowline Master with Stabilizing Placid Arm is built with the highest quality material.
The Placid Arm has been built using robust Aluminum Alloy. The springs used in this are made up of Stainless Steel which gives strength and stability.
And the Flycam Flowline Body Support Vest and Placid Arm is cleverly designed to guarantee it will work correctly and smoothly year in and year out.

Flycam Flowline Master for Camera & Gimbals (4-12kg/9-27lb) with Placid Stabilizing Arm

IN-ACTION VIDEOS

FLYCAM FLOWLINE

Flowline Weight

  Complete 3.6 kg / 8 lb

Payload

  4-12kg / 9-27lb

Height

  Mounted: 100 cm (39.4")
  Folded: 60 cm (23.6")

Suspension Rope Length

  152.5 cm (60") when fully stretched

Top Bar

  Length: 560mm
  Rotation: 180°

Waist Hip Strap

  Minimum Length: 81 cm (32 inches)
  Maximum Length: 125 cm (49 inches)

PLACID ARM

Construction

  Aluminum, Carbon Steel, Stainless Steel, EPDM rubber

Payload

  5-20 kg / 11- 44 lb

Dimensions

  Height: 205mm
  Width: 395mm
  Depth: 65mm

Weight

  1.80 kg / 3.96 lb

Packing Dimensions (LxWxH)

  42 x 20.5 x 12cm

Packing Weight

  2.40 kg / 5.28 lb

IN THE BOX

  Flycam Flowline Placid Two Axis Spring Arm (FLCM-FLN-PLA)
  Flycam Flowline Master Professional Support for Camera & Gimbals(4-12kg/9-27lb) (FLCM-FLN-MSTR-02)
  Bag Packing


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products





  • Is the placid already attached or does it need to be assembled after delivery?

    Yes, the placid is already attached.

x