-
The rugged rubber in the post behind his neck is a suspension system or is just a cover?
The rubber section on the vertical bar behind the neck is not a suspension system. It is simply a protective cover that conceals the connection point between the upper and lower sections of the bar.
-
Is Flycam Flowline Edge Stabilization Arm is compatible with FLCM-FLN-500N Flowline system.
Yes, Flycam Flowline Edge Stabilization Arm is compatible with FLCM-FLN-500N Flowline system.
-
What body sizes it will fit to?
It will fit to all body sizes from 28� to 56�.
-
What is the weight of the Flowline?
The Flycam Flowline itself weighs 4kg.
-
Will this work with my easyrig model?
Yes, this will work with your easyrig model. You just need to drill a hole for mounting the placid arm onto your rig.
-
Is it returnable for a full refund if it doesn’t meet my expectations upon delivery?
Yes, absolutely. We always backup our sales. In case, you don't like the product, we take it back within 30 days and you get a 100% refund.
-
Does this come with the shoulder rig?
No, the shoulder rig is not included with this Flowline model.
-
Is this model ideal for gimbal and dslr or should i get something with heavier weight capacity?
This Flowline comes with three different weight capacities as mentioned below :
- Flowline 300N: 5 - 8 kg (11 - 17.6 lb)
- Flowline 400N: 8 - 10 kg (17.6 - 22 lb)
- Flowline 500N: 10 - 12 kg (22 - 26.4 lb)
-
Can I use cage with this flowline?
Yes, you can use a cage with this flowline.
-
Can I purchase extra spring of higher strength to change and use heavier camera with it?
Yes, you can buy extra springs of higher strength to use for heavier camera setup.
-
For how long can I use it continuously?
This Flycam Flowline system can be used for whole day without any fatigue.
-
Can I use the Flowline placid arm with this Flycam flowline?
Yes, you can use the Flowline placid arm with this Flycam flowline model.
-
Does it come in bag packing?
Yes, this Flycam Flowline comes in a bag packing for easy transportation.
-
What is the warranty?
We provide 1 year warranty from the date of purchase Items which are covered by the warranty period will be replaced at no cost to the customer.Replacement parts of the product will be provided at nominal cost (covering the cost price of the replacement parts only) to the customers after the Warranty Period has expired.